Start point
Yeongjong-side public parking lot, or Cheongna Lake Park Parking Lot 4 / Simgokcheon Stream
Good to know
Opened 5 January 2026; total length 4.68 km, six lanes (both directions), with separate pedestrian and bike paths. Distance signs make pace checks easy. Starting from Cheongna Lake Park makes it a 21 km half-marathon course.
Official source
Checked against
Incheon Free Economic Zone Authority (IFEZ) — Cheongna Sky Bridge (Third Yeongjong Bridge) total length approx. 4.68 km, six lanes (both directions)
Source (Korean) →